Due to the high capacity of PURASPECJM materials, a smaller reactor size will usually be required for any given duty when compared to other fixed bed competitor offerings. This can offer a reduction in both the Capex and the physical footprint of the unit (which is of particular importance where space is limited such as offshore rig designs and revamps).

Johnson Matthey's technical team would be happy to work with the end user or EPC contractor to provide the optimum reactor design.